43 new, never-deployed assemblies for EV charging and commercial power distribution. Buy the configuration you need, starting with a single unit.
Breaker view
Enclosure viewAfter payment clears
Each assembly is sold individually at the price shown for its configuration. Choose the equipment and quantity your project needs. Minimum order: one assembly.
6 configurations · 43 units
| Configuration | Main | Qty | Assembly OEM | Breaker platform | Feeder configuration | Location |
|---|---|---|---|---|---|---|
| EPEC ACR480 | 2500A | 17 | QT Corporation | Siemens | 4 × 600AF / 600AT | 7 Charlotte / 10 Denver |
| EV-2U | 2000A frame / 1200A trip (LSIG, field-adjustable to 2000A) | 6 | Lincoln Electric Products | Schneider | 4 × 600A frame / 300A trip (thermal-magnetic, field-adjustable to 600A) | 5 Charlotte / 1 Denver |
| EV-2S | 2000A frame / 1200A trip (LSIG, field-adjustable to 2000A) | 7 | Lincoln Electric Products | 6 Schneider / 1 pending verification | 4 × 600AF / 300AT* | 7 Denver |
| EV-2S | 1200A | 3 | Lincoln Electric Products | Schneider | 4 × 400–600AF / 300AT | 3 Denver |
| EV-1 | 1200A | 9 | Lincoln Electric Products | Eaton | 4 × 400AF / 300AT | 6 Charlotte / 3 Denver |
| EV-2S | 600A | 1 | Lincoln Electric Products | ABB | 2 × 400AF / 300AT | 1 Compton |
QT ACR480 Combiner / Recombiner
EV-2 Universal
Priced above the EV-2S because this configuration is not tied to one utility's metering standard. Deployment in any territory is subject to the serving utility's requirements and project approval.
EV-2 Utility-Specific
EV-2 Utility-Specific
EV-1
EV-2 Utility-Specific
*One EV-2S unit (workbook row 27) has breaker-make and feeder-trip detail pending final serial-level verification; no dedicated drawing was supplied with the original package.
Get the serial-level workbook, arrange an inspection and request a written quote.
This 43-unit offering consists of new, unused and never-deployed outdoor switchgear in six configurations from 600A through 2500A. These switchboard assemblies use Siemens, Schneider, Eaton and ABB circuit breaker platforms. Equipment is in stock, with a shipment lead time of 48–72 hours after payment clears.
The inventory includes QT EPEC ACR480 AC combiner/recombiner equipment and Lincoln Electric Products EV-1 and EV-2 distribution assemblies.
Confirmed across the serial-level drawing package and applicable to the entire 43-unit lot unless noted. Known exceptions: one EV-2S breaker set is pending serial-level verification; the 600A EV-2S drawing schedules TMA main / LSI feeder trip units and lists the charging feeders at 304A; and the EV-2U drawing lists a 400A-frame electronic feeder part number against a 600A-frame description. Confirm the nameplate for the specific serial before design.
Shipping weights vary by configuration and are provided per serial in the inventory workbook.
The EV-2 line includes both utility-specific service-entrance assemblies and a utility-agnostic configuration for broader project deployment.
Most EV-2S assemblies were built to a specific utility's EUSERC service-entrance standard, which simplifies acceptance for projects in that utility's territory; final approval rests with the serving utility on each project. The drawings show utility metering and CT compartment details; the inventory workbook identifies the utility per serial.
EV-2U places the meter after the disconnect and has no utility-specific metering section. That broader deployment fit — subject to the serving utility's requirements and project approval — is why EV-2U pricing is above EV-2S pricing despite the same 2000A frame / 1200A LSIG trip architecture.
Utilities represented across the lot include: Southern California Edison, San Diego Gas & Electric, NV Energy, Tucson Electric Power, Xcel Energy, Pacific Power, Ameren, United Power, Longmont Power & Communications and Big Bend Electric Cooperative. Utility assignment is confirmed per serial in the inventory workbook.
These assemblies provide service entrance equipment and distribution for DC fast charging and large commercial loads. Applications include a Level 3 charging station at a convenience store or truck stop, fleet charging depots, and data center or microgrid power distribution.
Forty-three new, never-deployed outdoor switchgear assemblies for EV charging and commercial power distribution. Seventeen QT Corporation and twenty-six Lincoln Electric Products assemblies (Lincoln Electric Products Co., Inc. of Union, NJ—a switchgear manufacturer, not affiliated with Lincoln Electric, the welding company) are stored indoors and available now from Charlotte, Denver and Compton.
The workbook identifies the finished assemblies by OEM and the installed main and branch breaker families separately.
Breaker-set counts total 42 of 43 assemblies: one EV-2S breaker set (workbook row 27) is pending serial-level verification.
Real storage photographs supplied for this 43-unit offering.
They are new, unused and never deployed. The assemblies remain wrapped, banded and stored indoors.
These are finished outdoor service-entrance power-distribution assemblies, not loose breakers. The lot includes QT EPEC ACR480 AC combiner/recombiner equipment and Lincoln Electric Products EV-1 and EV-2 distribution assemblies.
Main frames include 600A, 1200A, 2000A and 2500A across six configurations. The EV-2U and 2000A-frame EV-2S assemblies use Schneider MTZ 1200A LSIG trip units with restricted-access adjustment per NEC 240.6(C)(3), field-adjustable to 2000A — one EV-2S breaker set is still pending serial-level verification.
Assembly OEMs are QT Corporation and Lincoln Electric Products. Breaker platforms include Siemens, Schneider, Eaton and ABB.
Eighteen units are in Charlotte, North Carolina; twenty-four are in Denver, Colorado; and one is in Compton, California. The equipment is stored indoors, with inspections available to qualified buyers by appointment.
All pricing is EXW each location. The buyer arranges transport, and we will help coordinate carriers and quotes if useful.
Yes. All three locations are prepared to load onto your carrier. Buyers should be prepared to unload with a forklift at destination.
Equipment ships 48 to 72 hours after payment clears, from Charlotte, Denver or Compton.
Drawings download directly from all six configuration cards above — no request needed. One EV-2S serial has no dedicated drawing. The serial-level inventory workbook and inspection coordination are available on request.
Yes. The equipment is sold free and clear of liens and encumbrances, with a bill of sale provided at closing.
No OEM warranty transfer is implied. The equipment is sold as-is, subject to buyer inspection and serial-level verification.